ICSS Modification for ATR steam purge nozzle upgrade and Damper control problems project

GAS has successfully executed an EPIC contract for the modification of an Integrated Control and Safety System for a GTL plant in Ras Laffan Industrial city.

GAS’s scope under the EPIC contract included:

Execution Methodology.

FAT/SAT Procedure.

Modified System Configuration Printout.

Red line mark up on the Logic diagram after the implementation.

Updated ICS Database and nest loading.

Updated Operating & maintenance manual, Asbuilt documentation.

Spare Capacity Calculation / CP / IO Loading .

Site Survey, Adequacy check and report, Supply of IA Foxboro and Triconex SIS Hardware, Software modification, testing, Hardware installation, commissioning, associated cable laying and wiring .

FAT, SAT and Start-up support.

Technology : IA Foxboro DCS and Triconex SIS .

Sector : Oil and Gas .