GAS has successfully executed an EPIC contract for the modification of an Integrated Control and Safety System for a GTL plant in Ras Laffan Industrial city.
GAS’s scope under the EPIC contract included:
Execution Methodology.
FAT/SAT Procedure.
Modified System Configuration Printout.
Red line mark up on the Logic diagram after the implementation.
Updated ICS Database and nest loading.
Updated Operating & maintenance manual, Asbuilt documentation.
Spare Capacity Calculation / CP / IO Loading .
Site Survey, Adequacy check and report, Supply of IA Foxboro and Triconex SIS Hardware, Software modification, testing, Hardware installation, commissioning, associated cable laying and wiring .
FAT, SAT and Start-up support.
Technology : IA Foxboro DCS and Triconex SIS .
Sector : Oil and Gas .